Basic, semi-comprehensive and comprehensive: read beyond the label.
Providers may use these names for different combinations of planned maintenance, labour, replacement parts and callout arrangements. Do not assume two offers with the same heading provide equal cover. Ask each bidder to identify the actual obligations and exceptions. This guide is a buyer’s comparison framework, not Elevaya’s standard contract or a statement that a particular package is available for every lift.
Build a parts-and-labour coverage schedule.
Request a written schedule that separates planned servicing, diagnostic attendance, corrective labour and replacement components. For each item, record whether it is included, excluded, capped or subject to prior approval. Clarify the treatment of the equipment you actually have rather than copying a parts list from a different system. If suitable components or technical information cannot yet be confirmed, the proposal should identify that uncertainty before acceptance.
- Planned service tasks and visit records
- Labour for assessing and addressing a reported issue
- Named replacement-component coverage and any limits
- Specialist access, handling or associated building work
- Glazing, decorative finishes and cabin refurbishment
- Work requiring separate approval and a separate quotation
Existing defects need their own starting point.
Record known faults and open recommendations before the new term begins. Ask how the acceptance survey findings affect coverage and whether initial corrective work is a prerequisite, an included task or separately quoted. Consider a simple example: a recurring door concern is reported before renewal. The useful question is not whether the package sounds comprehensive, but which written line explains responsibility for that existing concern and any later repair.
Compare callouts separately from planned visits.
A scheduled service visit is not the same as attendance following a fault report. Check how a callout is logged, which service hours apply, how the event is categorized and what attendance terms are agreed. Ask whether any limits or separately chargeable work apply. An annual total does not establish round-the-clock coverage or a guaranteed repair completion time. Emergency arrangements must be explicit; a quotation form is not an emergency response channel.
Clarify damage, upgrades and outside responsibilities.
Ask how the proposal treats damage, environmental exposure, misuse, work by others and requested improvements. These are questions to resolve, not a claim that every provider excludes the same events. Distinguish restoring an agreed function from modernizing controls or changing cabin design. Identify who is responsible for building access, power-related interfaces and any specialist tasks outside the accepted lift scope. Keep unresolved points visible until a written response is received.
Compare proposals using a worked decision sheet.
Imagine two offers for the same building, with no assumed price. One identifies planned visits and specified labour but leaves parts unclear; the other names components while leaving after-hours attendance unresolved. Neither is directly comparable until those gaps are answered. Put each issue in a separate row, record the relevant document section and ask for clarification. Choose against the surveyed asset and operating needs rather than the longest list of marketing benefits.
One building or a portfolio across UAE cities?
For an apartment or mixed-use building in JVC, Arjan, Dubai Marina or Business Bay, identify each lift and the facilities contact before comparing proposals. For a portfolio spanning Dubai, Abu Dhabi, Al Ain, Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah or Fujairah, use a separate asset schedule for each site. Record access, operating needs and callout terms individually. UAE-wide service coverage does not imply a branch or identical attendance arrangements in every city.
Renewal, handover and your next step.
Keep the agreed term, renewal process, notice arrangements and handover responsibilities together with the asset schedule. Request a record of open recommendations so the next service period starts with an accurate picture. Share your location, unit count, current contract end date and available equipment records with Elevaya. We review the requirement and arrange the technical site survey before issuing a quotation. The final accepted agreement, not this general guide, defines your coverage.
Questions, answered.
Does comprehensive mean all spare parts are included?
Not automatically. Ask for the named coverage, limits, exclusions and treatment of existing defects in writing. A package label is not a replacement-component schedule.
Is a comprehensive AMC always the best choice?
It depends on the assessed equipment, operating needs, proposed obligations and exclusions. Compare equivalent scope and unresolved risks rather than selecting solely by the package name.
Does the contract include modernization or cabin decoration?
Do not assume so. Restoring a function, replacing a covered component and changing the design are different scopes. Confirm any upgrade or refurbishment explicitly.
Can several lift brands be reviewed under one AMC enquiry?
Yes. Provide the manufacturer and available records for each asset. Elevaya is an independent multi-brand provider; acceptance depends on assessment, technical access, suitable parts and the agreed responsibilities.
Equipment suitability, service availability and site-specific requirements must be confirmed for each project.

